How do manufacturers sequence an EU Cyber Resilience Act schedule across multiple products?

Published by Porta Regulus B.V. (KvK 42062307)Last updated 24 Nov 2026
Direct Answer

Manufacturers sequence an EU Cyber Resilience Act programme backward from two statutory dates under Regulation (EU) 2024/2847. Article 14 vulnerability and incident reporting applies from 11 September 2026, while Annex I essential requirements, technical documentation, and CE marking apply on 11 December 2027. Products needing a Notified Body require an extra twelve-week lead buffer.

Key Takeaways

  • Separate portfolio governance tasks such as your vulnerability handling policy from per-product engineering tasks.
  • Run EU CRA scope, Annex III, and Annex IV triage first because Article 32 conformity routes alter engineering freeze dates.
  • Pull Annex III Class II, Annex IV Critical, and unharmonised Class I product schedules forward by at least twelve weeks for third-party review.
  • Export dependency-linked tasks directly into Jira, Asana, Monday, or Excel so product owners track deadlines in existing sprint tools.

Why does one flat checklist fail multi-product manufacturers?

A single organisation-wide checklist mixes one-time company governance with per-product technical files. Under Regulation (EU) 2024/2847, conformity belongs to each individual product with digital elements placed on the Union market, not to the company as a whole.

When a manufacturer sells fifteen products, governance work such as appointing a compliance lead or writing a five-year support period policy happens once. Risk assessments under Article 13(2), SBOM generation, and EU Declarations of Conformity repeat for each product release.

Which products need earlier engineering freeze dates under Article 32?

Default-class products follow Module A internal conformity control under Article 32(1), so engineering teams control their own sign-off calendar up to 11 December 2027. Important Class I products in Annex III Part I can also use Module A only when they apply a harmonised standard or common specification in full.

Important Class II products in Annex III Part II and Critical products in Annex IV require third-party conformity assessment through Module B+C, Module H, or a European cybersecurity certification scheme. Booking an accredited Notified Body and completing technical file examination adds months before market placement.

How does Daesit structure the 78-task backward plan?

Daesit splits Regulation (EU) 2024/2847 execution into portfolio governance and six work packages. You triage each product at `/triage` with zero login gate, record Annex III and Annex IV justifications in the Compliance Workspace, and export dated tasks into Jira, Asana, Monday, or Excel.

EU CRA engineering schedule impact by product class under Regulation (EU) 2024/2847
EU CRA Product ClassPermitted Article 32 RouteRecommended Schedule BufferPrimary Bottleneck
Default (Article 6)Module A internal controlStandard internal freezeArticle 13(2) risk assessment and Annex VII file
Important Class I with harmonised standardModule A internal control4 weeks for standard mappingDocumenting full prEN 40000 clause coverage
Important Class I without harmonised standardModule B+C or Module H12+ weeks before 11 Dec 2027Notified Body technical file examination
Important Class II and CriticalModule B+C, Module H, or EUCC12 to 20 weeks before 11 Dec 2027Notified Body or certification body availability

Frequently asked questions

Do legacy products placed on the EU market before 11 December 2027 need a full technical file?

Units placed on the market before 11 December 2027 are exempt from Annex I and Annex VII unless they undergo a substantial modification under Article 69(1). Article 14 reporting still applies to every in-scope product from 11 September 2026 under Article 69(3).